Network Rail has redeveloped the 180-yearold London Bridge station – the fourth busiest station in the country with over 54 million passengers passing through every year. To redevelop such a vast, complex site Network Rail required a team that would work together with one goal in mind and add value by presenting viable solutions. Eurosafe chose the MSA Latchways Constant Force Post (CFP) cable system for a complete rooftop fall protection solution. It is the only system approved by Kalzip, who supplied the roof at London Bridge.

Read more

No featured products in this case study

Contact Latchways plc - an MSA Brand by clicking the button below to find out which products were used in this case study.