NBS Source
I'm a manufacturer

Neaco specified for £14 million school development

OVERVIEW

The maintenance-free finish of Neaco’s powder coated aluminium balustrade has made it a long-standing favourite in the education sector, with countless specifications throughout the UK, and the latest example is a £14 million development at Elthorne Park High School in Ealing. Designed by Re-format and built by Balfour Beatty on behalf of Ealing Borough Council, the building includes a new multi-purpose performance and activity space, extended library facilities, additional Sixth Form teaching and study space. The balustrade features a metallic finish to handrails and stanchions complemented by glass panel infills for a contemporary appearance.

No featured products in this case study

Contact NEACO Ltd by clicking the button below to find out which products were used in this case study.

More case studies from NEACO Ltd

View all case studies (32)
Aluminium decking modified to assist visually impaired

Aluminium decking modified to assist visually impaired

Bespoke balconies and balustrade bridge the aesthetic divide between traditional and contemporary

Bespoke balconies and balustrade bridge the aesthetic divide between traditional and contemporary

Neaco balustrade featured at landmark college development

Neaco balustrade featured at landmark college development

Neaco handrails and balustrade featured at award-winning scheme

Neaco handrails and balustrade featured at award-winning scheme