WHEN WAS THE PROJECT?
June 2018
WHERE IS THE PROJECT?
Longhammarvegan, Haugesund
WHAT WAS THE BRIEF? WHAT WAS DESIGNED AND INSTALLED?
Metalform produced full turnkey design, fab and install steel and glass solution with fixed header and fixed side fields – including double door.
No featured products in this case study
Contact Metalform Group Ltd by clicking the button below to find out which
products were used in this case study.