NBS Source
I'm a manufacturer

Modular Build Apsire Project

OVERVIEW

Linear gap sealing for modular build environment. Particular concerns about firestopping before modules are placed on site and the movement capability required. Solution was partly fixed at factory for the modular build and on site retrospectively.

No featured products in this case study

Contact FSi Limited by clicking the button below to find out which products were used in this case study.

More case studies from FSi Limited

View all case studies (11)
Dubai Airport

Dubai Airport

Media City Manchester

Media City Manchester

Dublin Waste Facility - Dublin

Dublin Waste Facility - Dublin

Project Verde SW1 - London

Project Verde SW1 - London