by FSi Limited
Linear gap sealing for modular build environment. Particular concerns about firestopping before modules are placed on site and the movement capability required. Solution was partly fixed at factory for the modular build and on site retrospectively.
Contact FSi Limited by clicking the button below to find out which products were used in this case study.
Dubai Airport
Media City Manchester
Dublin Waste Facility - Dublin
Project Verde SW1 - London