NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

MIne Tailings Capping and Drainage - Pozidrain SKL and Erosaweb, Carrshield MIne Works, UK

OVERVIEW

The Barneycraig Lead mine located in the North Pennines operated between 1760-1920. Due to mine tailings being deposited on the River West Allen it became the second worst river by Northumbria River Basin Management. A plan to improve the river meant the tailings needed to be capped to prevent rain water infiltration. Stabilisation of the dam was also required. ABG proposed Pozidrain 4SKL, this provided a rapidly installed single layer system without compriising on containment. Erosaweb GWX was used on the 1:2.5 slope for soil reinforcement and this was fixed with a non piercing fixing solution.

No featured products in this case study

Contact ABG by clicking the button below to find out which products were used in this case study.

More case studies from ABG

View all case studies (31)
Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK

Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK

Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool

Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool

Stabilisation - Abweb and Abgrid, Quarry Bank Mill, Styal, Cheshire, UK

Stabilisation - Abweb and Abgrid, Quarry Bank Mill, Styal, Cheshire, UK

SuDS Pond - Groundwater Control, Pozidrain, Newcastle Airport, UK

SuDS Pond - Groundwater Control, Pozidrain, Newcastle Airport, UK