NBS Source
I'm a manufacturer

This case study is no longer available.

Mill Hill School

OVERVIEW

Procter Contracts was commissioned to carry out this Building Schools for the Future (BSF) project for a brand new school. The project included perimeter fencing and the installation of site hoarding. The 10-month project was carried out on time, snag free and within budget. Procter initially secured the site by erecting hoarding for the contractor of the project Kier Construction. We then supplied and installed 1.8m pro-twin wire mesh to the site, which was certified by Secured by Design and installed 3.0m twin wire fence for the sports pitches, including a bespoke timber bin store.

No featured products in this case study

Contact Procter Contracts by clicking the button below to find out which products were used in this case study.