Met Office

OVERVIEW

In September 2003, the Met Office moved its headquarters from Berkshire to the purpose-built £80 million structure designed, built and managed by a G4S-led consortium. When a number of louvres on the east and west elevations of the 57,000m2 headquarters began to show signs of failure, G4S appointed BriggsAmasco to supply and fit a new system that would combine airflow efficiency and rain defence.

No featured products in this case study

Contact Briggs Amasco Ltd by clicking the button below to find out which products were used in this case study.