NBS Source
I'm a manufacturer

MEDITE PREMIER FR- used to renovate The Central Bank of Ireland

OVERVIEW

Ireland’s most iconic new building, the Central Bank of Ireland on the banks of the River Liffey, was recently renovated into the showstopping demonstration of success it is today, after sitting for years as an unfinished shell; a symbol of the recession. Now it breathes new life as Ireland’s first ever BREEAM “Outstanding” rated building, setting an example of progressive construction that thinks about the future.

Products featured in this case study

View all products (16)
MEDITE PREMIER FR Euroclass B - Flame Retardant MDF - MDF

MEDITE PREMIER FR Euroclass B - Flame Retardant MDF - MDF

More case studies from MEDITE SMARTPLY

View all case studies (51)
MEDITE TRICOYA EXTREME Proves The Natural Choice At High - End Coastal Redevelopment.

MEDITE TRICOYA EXTREME Proves The Natural Choice At High - End Coastal Redevelopment.

SMARTPLY OSB used for giant tree at Glastonbury 2017

SMARTPLY OSB used for giant tree at Glastonbury 2017

SMARTPLY FR/FR Build  (Flame Retardant) OSB3 flooring pave the way for new Students in Liverpool

SMARTPLY FR/FR Build (Flame Retardant) OSB3 flooring pave the way for new Students in Liverpool

SMARTPLY PATTRESS PLUS- THE TIME SAVING PANEL GREATLY REDUCES INSTALL TIME

SMARTPLY PATTRESS PLUS- THE TIME SAVING PANEL GREATLY REDUCES INSTALL TIME

More case studies from Medium-density fibreboards (MDF)

View all case studies (1)
The Run Hub, Dublin.

The Run Hub, Dublin.