OVERVIEW

No.1 Old Trafford provides 214,000 square feet of residential and amenity space, including 354 apartments over two blocks rising to 14 and 17 storeys tall respectively. The waterfront setting includes the newly created tram stop providing excellent links to central Manchester and Salford Quays.


D+H UK provided a sophisticated and complex system for the mechanical smoke ventilation across the two blocks. The system was chosen as it meets all the design criteria and applicable EN standards.


The simple wiring system meant the cables could be installed early in the construction program, allowing the builder to complete the internal finishes.

This project is significant as it is the first D+H mechanical smoke ventilation system to be installed in the UK.

No featured products in this case study

Contact D+H UK by clicking the button below to find out which products were used in this case study.

More case studies from Natural smoke and heat exhaust ventilators

View all case studies (6)
London Aquatic Centre - Smoke & Natural Ventilation

London Aquatic Centre - Smoke & Natural Ventilation

Ikea, Dublin - Smoke Ventilation

Ikea, Dublin - Smoke Ventilation

Sudbury House

Sudbury House

Grafton Quarter

Grafton Quarter

More case studies from Mechanical services control panels

View all case studies (1)
Ireland's School Of Rock

Ireland's School Of Rock

More case studies from Fire and smoke dampers

View all case studies (1)
CR60 and ONE Reference Project - Resecentrum Göteborg, Sweden

CR60 and ONE Reference Project - Resecentrum Göteborg, Sweden