NBS Source
I'm a manufacturer

This case study is no longer available.

McLaren's 160 Aldersgate - Gas Two Tier Rack

OVERVIEW

Contracted by McLaren Construction on the 160 Aldersgate commercial development, The Bike Storage Company supplied and installed 240 Gas Assisted Two Tier Racks complete with an anti-slip stair ramp. The Gas Assisted Two Tier Racks provides exceptional usability by assisting users when loading their bike on the top tier. With the 160 Aldersgate Development, The Bike Storage Company also provided a complete floor and wall signage and design pack.

No featured products in this case study

Contact The Bike Storage Company by clicking the button below to find out which products were used in this case study.