NBS Source
I'm a manufacturer

Mass Rapid Transit: Fall Protection System Required for Rooftop

OVERVIEW

The MRT project is a planned 3-line mass rapid transit system with a total of 101 stations. Klang Valley MRT is poised to be the backbone of the public transport system in Kuala Lumpur Malaysia and is expected to become operational in phases and save 280 million man hours annually in commuter travelling time. The roofs required engineered horizontal lifeline systems for workers to be kept safe while performing periodic maintenance tasks. These systems had to be robustly designed to arrest a worker’s fall and also protect the building envelope from damage in the event of a fall.

No featured products in this case study

Contact MSA Safety (Latchways) – Fall Protection by clicking the button below to find out which products were used in this case study.

More case studies from MSA Safety (Latchways) – Fall Protection

View all case studies (19)
Up at the O2

Up at the O2

ArcellorMittal: Integrated Harness System for Self-Rescue

ArcellorMittal: Integrated Harness System for Self-Rescue

Arquiva: Efficient Servicing and Maintenance of Telecoms Masts and Towers

Arquiva: Efficient Servicing and Maintenance of Telecoms Masts and Towers

Arup: Access Strategy for Building Rooftops and Ongoing Maintenance

Arup: Access Strategy for Building Rooftops and Ongoing Maintenance