Sherwn-Williams demonstrated what technical assistance can be provided on projects before any quotations or specifications are organised. A low viscosity primer Resutop Binder was recommended as a penetrating primer to case harden and consolidate the screed. Epoxy screed repairs were installed where required to make good any damaged areas. Once a sound substrate was established Resuprime MVT moisture tolerant primer was installed incorporating a fabric mesh over all joints and pitted areas to re…
Show moreContact Sherwin-Williams High Performance Flooring by clicking the button below to find out which products were used in this case study.
Sherwin-Williams Resuthane TG69 supplied to Billingsgate Market for long term hygienic flooring solution
The Copperworks in Leeds required a floor refurbishment over some 30000 square metres - Sherwin-Williams Resucoat HB product provided the solution.
Decorative and seamless flooring supplied for atrium area to Radclyffe School
Morrisons hot cross bun bakery gets long lasting flooring solution