The hall’s roof had started leaking and was in a desperate need of repair. IKO’s technical engineer carried out a moisture probe analysis to establish the extent of the damaged membrane and deck beneath.
No featured products in this case study
Contact IKO PLC by clicking the button below to find out which
products were used in this case study.