LINIAN Case Study - HMP Grampian

OVERVIEW

The £140m state-run facility replaced the former HMPs Aberdeen and Peterhead. The Main Contractor for the project was Skanska, and the Company has developed the structural and civil design as well as undertaking the installation of mechanical and electrical services. The fire alarm installation was subcontracted and a 2000 alarm point system had to be installed requiring security, speed and efficiency. The LINIAN Clip was an integral part of this installation and proved to save time and money whilst achieving and exceeding all requirements.