Lewis Deck in an ICF Build.

by CDI Innovative Construction Materials Ltd

  Favourite

The building was constructed using ICF blocks that are to have a rendered finish. Internally the ground floor is a concrete slab and the upper floor has timber posi-joists with the Lewis Deck and resilient strips laid above. 16mm underfloor heating pipes are then clipped into our new clip rail system with a free flowing screed then poured on top, 50mm thick. This then gives 20mm cover to the heating pipes, maximising the efficiency of the whole system.

Read more

No featured products in this case study

Contact CDI Innovative Construction Materials Ltd by clicking the button below to find out which products were used in this case study.