Leeds Beckett University wanted an auditorium that could also be used for business events. CPS Manufacturing worked alongside the architect and university estates team to design, manufacture and install 250 Asset A20 chairs as well as the full steel tiering that the seats sit on. The seats are durable and reduce sound absorption due to their preformed plywood backs and bases, but also prestigious looking for business use.
Contact CPS Manufacturing Co LLP by clicking the button below to find out which products were used in this case study.
Alexandra Palace Theatre Restoration Seating, Orchestra Pit and Staging
Villa Cross Church of God Prophecy Auditorium Seating
Exeter Cathedral Staging
2012 Olympic Games Media Centre Auditorium Seating and Staging