The new Leeds Arena was a £60m project by Leeds Council to create a striking new stadium, which has been crowned with a 7,500sq m Sika Sarnafil single ply roofing system, installed by experienced contractor Lakesmere.
The fact that Sika Sarnafil was the first roofing manufacturer to be BIM
ready played a huge part in the specification, and in turn improved the ability to review designs and rationalise ideas, whilst cost saving using BIM was highlighted through material specifications and design coordination.