NBS Source
I'm a manufacturer

Landmark Place - Perfect Edge Finishing for a Prestigious Residential Development

OVERVIEW

Schlüter-Systems provided a variety of trims and movement joints to ensure a damage-free finish for the tiled walls and floors of high-end residential project, Landmark Place. The 280,193sq ft Barratt Homes development has an enviable position on the north bank of the River Thames, near the iconic Tower Bridge, and boasts 165 one-bed suites, one, two and three bed apartments and penthouses across 10 storeys. It replaces Sugar Quay, a 1970s office building built for Tate and Lyle, which was purchased by CPC Group back in 2012.

Products featured in this case study

View all products (121)
Schlüter®-DITRA - Uncoupling and Waterproofing Membrane

Schlüter®-DITRA - Uncoupling and Waterproofing Membrane

Schlüter®-SCHIENE - Floor Tile Trim

Schlüter®-SCHIENE - Floor Tile Trim

More case studies from Schlüter-Systems Ltd

View all case studies (34)
The Eiffel Tower - Uncoupling an Icon

The Eiffel Tower - Uncoupling an Icon

Tate Britain - An Artistic Uncoupling of Tile

Tate Britain - An Artistic Uncoupling of Tile

Lalit Hotel London - Wetrooms Fit for a Maharaja

Lalit Hotel London - Wetrooms Fit for a Maharaja

Adare Manor - Minimising Build-Up in The Manor

Adare Manor - Minimising Build-Up in The Manor

More case studies from Plastics sheets

View all case studies (25)
Drumhierny Woodland Holiday Lodges

Drumhierny Woodland Holiday Lodges

The Moorings, Wales

The Moorings, Wales

The Willows, EnerPHit Retrofit

The Willows, EnerPHit Retrofit

Forensic Laboratory Backweston

Forensic Laboratory Backweston