Landfill Cap Drainage & Gas Venting - Pozidrain, Chelson Meadows, Landfill Site, Plymouth, UK

OVERVIEW

For more than four decades Chelson Meadow was the main landfill site for the Plymouth area. An estimated 17,650,000 tonnes of landfill needed capping with a permanent geosynthetic capping system. The capping commenced in 2005 and had to be closed by 2012. ABG Pozidrain 6S250/NW8 was installed above and below Claymat GCL to provide drainage, gas venting and adequate protection. Pozidrain provided the required flow capacity and interface shear strength. Gas from the site was harnessed to be sent back to the national grid to be used.

No featured products in this case study

Contact ABG by clicking the button below to find out which products were used in this case study.

More case studies from ABG

View all case studies (31)
Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK

Suds Permeable Paving - Sudspave, Quarry Bank Mill, Style, Cheshire, UK

Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool

Erosion Control, Flood Embankment, Erosamat, Greatham, Hartlepool

Stabilisation - Abweb and Abgrid, Quarry Bank Mill, Styal, Cheshire, UK

Stabilisation - Abweb and Abgrid, Quarry Bank Mill, Styal, Cheshire, UK

SuDS Pond - Groundwater Control, Pozidrain, Newcastle Airport, UK

SuDS Pond - Groundwater Control, Pozidrain, Newcastle Airport, UK