NBS Source
I'm a manufacturer

This case study is no longer available.

Label Craft turns to Gypsol TS-20 thin screed to provide the solution to their print room floor refurbishment.

OVERVIEW

The client’s Production Manager, Mr John MacDonald confirmed the printing machine “has to be level otherwise the machine won’t work” and in early September, Gypsol TS20 Screed was poured on a Saturday morning providing a flat level and very thin layer to the existing uneven surface. Due to the physical strengths and rates of drying of Gypsol’s TS20 screed and the very speedy un-bonded installation, the client was able to minimise production delays and mount the press onto the freshly screeded floor after just two weeks.

No featured products in this case study

Contact LKAB Minerals by clicking the button below to find out which products were used in this case study.

More case studies from LKAB Minerals

View all case studies (6)
Vistry Partnerships select Gypsol on one of their largest regeneration sites in London

Vistry Partnerships select Gypsol on one of their largest regeneration sites in London

Short lead times with Gypsol Complete

Short lead times with Gypsol Complete

Gypsol screeds launched in Australia

Gypsol screeds launched in Australia

New home installed with Gypsol HTC

New home installed with Gypsol HTC