NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

Kings Hill Primary School is an early 19th Century building. The old roof slates were flaking due to frost damage with many slipped / lost slates needing replacing.

OVERVIEW

IKOslate was chosen by the client (Walsall MBC) as a low weight, cost effective alternative. The products CO2 credentials were also a key factor. During the installation IKO Rubershield Pro and IKO Armourvent were also installed to provide cross flow ventilation, and IKO’s lead substitute IKOflash was installed in the valleys and for flashing the chimneys. The steep pitch of the roof provided the contractor with a challenge particularly with the cold damp Autumn mornings.

No featured products in this case study

Contact IKO PLC by clicking the button below to find out which products were used in this case study.