King’s Cross Station

OVERVIEW

BriggsAmasco undertook resurfacing at King’s Cross Station, improving platforms and walkways, as part of the station’s wider redevelopment programme. A team of eight BriggsAmasco operatives and managers carried out works throughout the night on a shift basis over a three month period. Using a mastic asphalt system laid across concrete floor slabs, platforms one to eight will each benefit from new surfaces, following removal of any existing asphalt. The new asphalt has been mixed with luminous sand which provides both an aesthetically pleasing finish whilst offering a good foot grip and finish.

No featured products in this case study

Contact Briggs Amasco Ltd by clicking the button below to find out which products were used in this case study.