This project proved to be quite a challenge for LCJ Engineers and Rondo to design, due to the very high wind loads together with wall heights up to 4.2m, which resulted in having back to back 150mm studs at 300mm centres. This project was nicknamed “Steel City” and from viewing the images, you can see why.