It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks

OVERVIEW

The 2014 Commonwealth Games’ swimming competition was played out at Tollcross International Swimming Centre. In anticipation of the games, the centre’s facilities underwent a complete refurbishment. Some of the screed below the tiles on the main competition pool floor had separated from the concrete pool tank. The entire floor needed to be re-laid. Glasgow City Council Scott hired, Tilecraft, a specialist tiling works company that delivers high quality tiles, to lay the tiles and specified products from ARDEX UK. A fast track solution which would produce high quality results was needed, and ARDEX UK seemed the logical choice.

Products featured in this case study

View all products (92)
ARDEX A 38 Ultra Rapid Drying Screed Cement

ARDEX A 38 Ultra Rapid Drying Screed Cement

More case studies from Ardex UK Ltd – High Performance Flooring, Tiling, Screeding and Building Products

View all case studies (50)
British Museum - London

British Museum - London

Victoria and Albert Museum - London

Victoria and Albert Museum - London

North Manchester General Hospital

North Manchester General Hospital

Burj Khalifa - Dubai

Burj Khalifa - Dubai

More case studies from Quick-drying levelling screed mixes

View all case studies (14)
Madrid Airport

Madrid Airport

Tollcross International Swimming Centre

Tollcross International Swimming Centre

Savoy Hotel Restoration Project

Savoy Hotel Restoration Project

It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks

It’s a ‘race to the finish,’ as ARDEX UK complete Commonwealth Games Pool refurbishment in 8 weeks