NBS Source
I'm a manufacturer

This case study is no longer available.

Iron Mountain

OVERVIEW

We manufactured and installed a cantilevered sliding gate, matching pedestrian gate and palisade fencing, plus 358 security mesh to the remaining site perimeter for this leading data storage company. Very pleased with all aspects of the job and in particular the speed of installation. The sliding gate was automated via keypad, remote control and intercom with an override from the reception area, and was of course installed in strict accordance to current European Machine Directives and fully CE marked.

No featured products in this case study

Contact Procter Contracts by clicking the button below to find out which products were used in this case study.