NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

Inlaid Motorway Crack Sealing System

OVERVIEW

The project involved treatment of longitudinal and transverse cracking in lanes 1 and 2 of the carriageway. IKO Permatrack H (High Modulus) Inlaid Crack Repair System was installed as a solution to a reflective crack extending to a length of 6.7km and IKO Permatrack Samiband was used to repair over 3km of transverse cracking in the carriageway .

No featured products in this case study

Contact IKO PLC by clicking the button below to find out which products were used in this case study.

More case studies from IKO PLC

View all case studies (88)
Essential Roofing Works Carried Out For Sewage Treatment Works

Essential Roofing Works Carried Out For Sewage Treatment Works

1,000m2 Ecological, Air Purifying Roofing Refurbishment for a Library

1,000m2 Ecological, Air Purifying Roofing Refurbishment for a Library

Manhole Reinstatement - IKO Pacopatch, Market Harborough

Manhole Reinstatement - IKO Pacopatch, Market Harborough

IKO Polimar CRS used for Trimpley Water Treatment

IKO Polimar CRS used for Trimpley Water Treatment