NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

IKO Permatrack Bridge Surfacing Saves Tower Bridge

OVERVIEW

The bridge was closed in September 2016 for three months while necessary repairs were made to the lifting sections, walkways and approaches.

No featured products in this case study

Contact IKO PLC by clicking the button below to find out which products were used in this case study.