OVERVIEW

The original profiled metal decking was covered with a layer of fibreboard and a layer of felt. Deterioration was so bad in places that entire areas of the roof needed replacing. Some areas were so fragile that it was dangerous for contractors to walk on them. Starting from the less damaged areas of the roof, the original roofing was removed and replaced the profile metal deck with a spacer support system onto which was laid fibreboard and then the IKO Mach One system from IKO.

No featured products in this case study

Contact IKO PLC by clicking the button below to find out which products were used in this case study.

More case studies from IKO PLC

View all case studies (88)
Essential Roofing Works Carried Out For Sewage Treatment Works

Essential Roofing Works Carried Out For Sewage Treatment Works

1,000m2 Ecological, Air Purifying Roofing Refurbishment for a Library

1,000m2 Ecological, Air Purifying Roofing Refurbishment for a Library

Manhole Reinstatement - IKO Pacopatch, Market Harborough

Manhole Reinstatement - IKO Pacopatch, Market Harborough

IKO Polimar CRS used for Trimpley Water Treatment

IKO Polimar CRS used for Trimpley Water Treatment