Hilton Hotel

OVERVIEW

The main roof area and the side ballroom roof, 3000m2 in total, were waterproofed with Permatec Hot Melt system with an extruded insulation MK layer paved walkways and 20/40 gravel ballast to the remaining areas. The Plant room roof 500M2 1.8 Sarnafil Light Grey mech fixed to metal deck and insulation. Level 8 a secret gutter was waterproofed by Hyflex using Exemplar liquid applied waterproofing,above the gutter marine ply was installed to joists to create as balcony which was subsequently waterproofed by Hyflex again using Exemplar BW system.