Private school, Hill House School in Doncaster requested two staging systems from CPS.
One stage was used as the performance stage with a full curtain, lighting and sound system as well as cost-effective black Alu Rapid staging platforms.
The other stage was to be used as demountable tiered spectator seating including carpeted Alu Rapid platforms to reduce audience noise levels and handrails on each side.
No featured products in this case study
Contact CPS Manufacturing Co LLP by clicking the button below to find out which
products were used in this case study.