This highly prestigious project saw us take control of the design of all the railings, gates and bespoke metalwork we then went on to manufacture and install. This was a very large contract that carried out for over an 18 month period. We were very proud to be involved in the redevelopment of the old Arsenal Stadium, which very much allowed us to demonstrate our design and manufacturing skills across a wide range of applications.