Hethel Engineering Centre supports high performance engineering companies located throughout Norfolk. The original building at the centre had been operating at maximum capacity and they urgently required a new building to satisfy increasing levels of demand. The client wanted the new facility to meet a high level of sustainability, achieving a BREEAM excellent rating and using key renewable technologies, such as photovoltaics (PV), to minimise its environmental impact.
No featured products in this case study
Contact Bauder Ltd by clicking the button below to find out which
products were used in this case study.