NBS Source
I'm a manufacturer

This case study is no longer available.

Heritage Church Chimney Lining - FuranFlex Case Studies

OVERVIEW

Job type: Leaking Chimney Project Length: 1 day Completed by: Old Mill Chimneys Initial Situation: A leaking chimney at A 1000-year-old church meant that a new liner was required. The chimney would not accept stainless steel lining. Project Challenge: Maintain adequate cross-sectional area. Future proof the chimney for the new boiler plant. Ensure no damage to the building Liner Chosen: FuranFlex 25 Black Result: FuranFlex 25 Black liner of the correct dimensions was installed. It is gas and water-tight to ensure suitable for high efficiency or condensing appliances. Installation completed on time and within budget.

No featured products in this case study

Contact Kompozit'All UK by clicking the button below to find out which products were used in this case study.

More case studies from Kompozit'All UK

View all case studies (8)
Heritage Open Gas Fireplace

Heritage Open Gas Fireplace

Hospital Kitchen Extract Lining

Hospital Kitchen Extract Lining

School Heating Renovation

School Heating Renovation

Cathedral Ventilation Lining

Cathedral Ventilation Lining