NBS Source
I'm a manufacturer

This case study is no longer available.

Additional Parking At Office Facility Using CORE Pro Grass Reinforcement Grid

OVERVIEW

Main contractors Matrix Parking solutions were contracted by the landlord Corporate Estates to provide additional parking at a shared office facility in Henley-on-Thames. The proposed area was a very old macadam surface that had totally broken down leaving a messy surface with various pot holes and puddles for office workers to avoid whilst using the car park. The area had no working drainage system in place. The clients wanted a free draining surface that would not require constant maintenance and could handle the frequent car use.

No featured products in this case study

Contact CORE Landscape Products by clicking the button below to find out which products were used in this case study.