NBS Source
I'm a manufacturer

This case study is no longer available.

Heathrow Terminal 2, 3 and 5

OVERVIEW

With over 50 WC facilities throughout the terminal, all needing to meet strict, accessibility and durability criteria, a new approach to the washroom specification was required. T5’s accessibility strategy demanded that all washroom facilities should not only meet but surpass the current Part M Regulations and Design Disabilities Act. Unfortunately there was no product in the market place that met the requirements. Not willing to accept the usual approach adopted of “tacking on” an unsightly back box to the rear of a standard WC pan, BAA Design approached VitrA U.K. Ltd. in order to meet the 750 mm projection

No featured products in this case study

Contact VitrA (UK) Ltd by clicking the button below to find out which products were used in this case study.