Healthcare Building featuring HDI’s Kubit Railing and balustrade system with Oak Cladding
OVERVIEW
‘Corporate Case Study - HDI’s Oak Clad Shoe system created for Healthcare Building.
Balustrade,Railing system ,stainless steel,powder coat,pre engineered,design, perforated panel,flat post,stairs, oak cladding,laminated glass,led,handrail,wood handrail,smoke baffle,picket,wire mesh,low iron glass,
No featured products in this case study
Contact HDI Railing Systems by clicking the button below to find out which
products were used in this case study.