NBS Source
I'm a manufacturer

This case study is no longer available.

Harrods

OVERVIEW

Harrods is close to unveiling the first phase of a £200 million overhaul ordered by its new Qatari owners. The listed building status meant that Harrods executives had to consult English Heritage on almost every aspect of the restoration. The installation of the escalator by Make architects has allowed windows to be reopened that had been bricked up since the Eighties, TRC carried out the refurbishment of these windows which included replacing the existing glass to a bomb and solar reflective type, full decoration internal and external along with replacing and refurbishing the existing ironmongery.

No featured products in this case study

Contact Zyle Fenster by clicking the button below to find out which products were used in this case study.

More case studies from Zyle Fenster

View all case studies (8)
West Waterford, Ireland

West Waterford, Ireland

Vilnius, Lithuania

Vilnius, Lithuania

Dollar, Scotland

Dollar, Scotland

Arches, Lithuania

Arches, Lithuania