by Wallbarn Ltd
This project involved a penthouse with a huge roof terrace. The existing deck was dilapidated and needed complete replacement. The existing decking needed to be lifted, cut up and removed. The terrace was jet-washed and sealed. Using ipe tiles on top of adjustable pedestals keeps the tiles out of standing water and creates space underneath for cables, etc. Rooftop terraces are difficult to access. 500x500mm timber tiles are much easier to manually handle and transport than long plank decking. The tiles aren’t fixed to the pedestals, making them future-proofed.
Contact Wallbarn Ltd by clicking the button below to find out which products were used in this case study.
Adjustable Paving Supports - Woodbury Close, Finsbury Park
Instant Green Roof - Wimbledon - Care Home - M-Tray®
M-Tray® Instant Green Roof - The May Fair Hotel
iDecking Project - Dunalastair, Perthshire, Scotland