This case study is no longer available.
OVERVIEW
Harbour Central is a brand new development in London’s Docklands, comprising a total of 642 private apartments divided across five residential buildings, along with a leisure complex. One, two and three bedroom apartments along with eight penthouse apartments, only minutes from canary wharf.
Our YELOfon HD10+ was installed in this development for is unrivalled acoustic performance when used to isolate a floating screed from a structural concrete floor. This product also works in conjunction with underfloor heating.
Contact Cellecta Ltd by clicking the button below to find out which products were used in this case study.
Aris House, Lymington Road
Admirals Quay, Southampton
Alexandra House, Portsmouth
Arras Way, Folkestone