NBS Source
I'm a manufacturer

This case study is no longer available.

Gypsol Screed Precompletion Sound Testing

OVERVIEW

This scheme comprised 3 blocks of apartments each having 3 stories requiring a total of just over 3000 square meters of screed. As the client was in control of the design he called upon the expertise of our technical team to help him to decide the best route and the most cost effective design. He opted for pre-completion sound testing which allowed him to design the floors in such a way as to mitigate the costs of the testing. Our specification manager advised Gypsol Classic screed as the most cost effective and appropriate material and completed a NBS specification.

No featured products in this case study

Contact LKAB Minerals by clicking the button below to find out which products were used in this case study.

More case studies from LKAB Minerals

View all case studies (6)
Vistry Partnerships select Gypsol on one of their largest regeneration sites in London

Vistry Partnerships select Gypsol on one of their largest regeneration sites in London

Short lead times with Gypsol Complete

Short lead times with Gypsol Complete

Gypsol screeds launched in Australia

Gypsol screeds launched in Australia

New home installed with Gypsol HTC

New home installed with Gypsol HTC