NBS Source
I'm a manufacturer

Goodmayes Hospital

OVERVIEW

With the client looking to achieve a fully hygienic, long-lasting finish it was only natural to incorporate BioClad’s full suite of products throughout the facility. Working with the client, it was evident that time was an important factor in the project planning process. The 15 working day turn-around of BioClad’s BioPod unit appealed to the client alongside the bespoke design of the unit which can be manufactured to fit any specification.

No featured products in this case study

Contact BioClad by clicking the button below to find out which products were used in this case study.

More case studies from BioClad

View all case studies (11)
A Microbiological Analysis of BioClad PVC Wall Cladding Installed in a Food Preparation Environment.

A Microbiological Analysis of BioClad PVC Wall Cladding Installed in a Food Preparation Environment.

Raigmore Hospital Critical Services Upgrade (CSU)

Raigmore Hospital Critical Services Upgrade (CSU)

BioClad/BioPod Specified for State-Of-The-Art Veterinary Clinic

BioClad/BioPod Specified for State-Of-The-Art Veterinary Clinic

Hinkley Point C Nuclear Power Station

Hinkley Point C Nuclear Power Station