This site uses cookies to store information on your computer. Learn more about these cookies, and how to opt out of them. Find out more

NBS Source

GEC ANDERSON SELECTED TO CATER FOR SUSTAINABLE LAMBETH COMMUNITY PROJECT

OVERVIEW

A highly sustainable Education & Visitor Centre is nearing completion alongside a historic landmark in a south London park, with the fit out including the installation of stainless steel sinks, work-surfaces and shelving units, supplied and installed by sector specialist, GEC Anderson. 

Products featured in this case study

View all products (59)
Sink Bowl BE50

Sink Bowl BE50

Decimetric® Tall Cabinets

Decimetric® Tall Cabinets

Decimetric® Base Frames

Decimetric® Base Frames

Decimetric® Wall Cabinets

Decimetric® Wall Cabinets

Decimetric® Shelving

Decimetric® Shelving

Decimetric® Classic Sinks and Worktops

Decimetric® Classic Sinks and Worktops

Decimetric® Sinks and Drainers

Decimetric® Sinks and Drainers

Decimetric® Classic Worktops

Decimetric® Classic Worktops

More case studies from Anderson, GEC Ltd

View all case studies (14)
Foster + Partners

Foster + Partners

Bartlett School of Architecture

Bartlett School of Architecture

GEC Anderson Island Top

GEC Anderson Island Top

GEC Anderson Outdoor Kitchen

GEC Anderson Outdoor Kitchen

More case studies from Kitchen drawer units

View all case studies (1)
Adjustable solutions are helping residents at Blackwood House live their lives to the fullest!

Adjustable solutions are helping residents at Blackwood House live their lives to the fullest!