Furanflex chimney liner installation at Brighton Town Hall

OVERVIEW

Brighton Town Hall is a Grade 1 Listed property. Many unsuccessful attempts had been made to install 300mm diameter Stainless Steel Flexible Liners. Holes were excavated in the chimney to pull the steel liner through but attempts proved unsuccessful and the chimney sealant failed to seal the holes. Using FuranFLEX-25 Black ensured the chimney was lined with one-piece lining with no joints and carrying a 25-Year Guarantee. A survey was carried out on the chimney to confirm dimensions and condition of the flue. The installation of the FuranFlex chimney lining was carried out and finished within one day.

No featured products in this case study

Contact Kompozit'All UK by clicking the button below to find out which products were used in this case study.

More case studies from Kompozit'All UK

View all case studies (8)
Heritage Open Gas Fireplace

Heritage Open Gas Fireplace

Hospital Kitchen Extract Lining

Hospital Kitchen Extract Lining

School Heating Renovation

School Heating Renovation

Cathedral Ventilation Lining

Cathedral Ventilation Lining