by Fixfast Ltd
Specialist roofing and cladding contractor Metclad Ltd were employed by main contractor Bowmer & Kirkland to provide the roofing and cladding works. Fixfast helped to ensure the best fastener systems were used for the correct applications. For the flat roofing, efficient thermally broken systems were used in order to met all the regulatory standards. In terms of facade work, Fixfast supplied fastener systems designed to be aesthetically pleasing. Our DrillFast Lacquered range was used for all coloured facades where fasteners were visible. Where there was a need to invisibly fix panels, Fixfast supplied the specialist Sika Tack adhesive system.
Contact Fixfast Ltd by clicking the button below to find out which products were used in this case study.
Leeds Arena
America's Test Cup Building
Pondwick's Close, St Albans
Worthing Pools