Flooring Solutions - Aston Martin

OVERVIEW

BASF’s crack-bridging MasterTop 1324 system provided all the components necessary to allow an overlay of old, variable substrates, offering a single-source solution. MasterTop 1324 flooring system was applied to a workshop area totalling over 3500m2. The MasterTop system met the client’s requirement for a flat, smooth, seamless and decorative flooring finish that eliminated the need for expansion joints and resolved the undulations and cracking in the substrate.