Flat Roof Replacement Implementing Safe2Torch Best Practice
OVERVIEW
This project had a wide ranging number of detailing factors to overcome with cladding abutment details and change in levels to be redesigned and encompassed into a system that also drained the roof areas of their historic high levels of standing water.
Some of the existing construction build had not taken into account any suitable maintenance of the roof with sections being completely inaccessible and thus reducing the performance of the waterproofing.
No featured products in this case study
Contact IKO PLC by clicking the button below to find out which
products were used in this case study.