Five star partition installation

OVERVIEW

When Moving Designs were asked to undertake a partition replacement in a five-star hotel in Manchester, we were certainly up for the challenge. Four tonnes of our Prestige acoustic partitioning were carried up two flights of stairs by nine of our skilled fitters; this had to be meticulously planned around the hotel users. The existing track had to be cut out of the ceiling to enable a new track to be replaced, seventeen panels and one pass door measuring 3.8 were installed, the plasterboard ceiling was re-instated, skimmed and re-decorated.

No featured products in this case study

Contact Moving Designs Ltd - Acoustic Partition & Sound Masking Specialist by clicking the button below to find out which products were used in this case study.