NBS Source
I'm a manufacturer

This case study is no longer available.

Fielding Meadow, Ratby

OVERVIEW

The 36 homes on the Cawrey Homes’ Fielding Meadow development are built to level 4 of the Code for Sustainable Homes, using a ‘fabric first’ approach, with H+H aircrete blockwork, coupled with different renewable technologies. Air Source Heat Pumps deliver hot water and heating to underfloor pipework on the ground floors and radiators on first floors. Fabric heat losses are reduced by highly insulated ground floors, 200mm wide filled wall cavities and ‘green’ (sedum) roofs. Roof fins provide passive ventilation to reduce overheating in summer, solar PV panels generate electricity and energy efficient appliances are included in every home.

No featured products in this case study

Contact H+H UK Ltd by clicking the button below to find out which products were used in this case study.

More case studies from H+H UK Ltd

View all case studies (5)
I-House using Celcon Vertical Wall Panels

I-House using Celcon Vertical Wall Panels

Stanpit I-House, Karm Homes

Stanpit I-House, Karm Homes

Bottle Lane Self-Build Project

Bottle Lane Self-Build Project

Oyster Reach, Whitstable, Kent

Oyster Reach, Whitstable, Kent