NBS Source
I'm a manufacturer

This version of the case study is no longer available. View latest

fermacell gypsum fibreboard at heart of new Great Ormond Street Hospital building

OVERVIEW

Around 34,000 sq m of gypsum fibreboard has been installed throughout the internal walling of The Morgan Stanley Clinical building (Phase 2A), which will form one half of the £300 million Mittal Children’s Medical Centre at Great Ormond Street Hospital.

Products featured in this case study

View all products (54)
fermacell® 1S31B Insulated Partition - Insulated Partition System

fermacell® 1S31B Insulated Partition - Insulated Partition System

fermacell® 1S36 Partition - Metal Stud Partition System

fermacell® 1S36 Partition - Metal Stud Partition System

More case studies from James Hardie Building Products Ltd

View all case studies (22)
Hardie® VL Plank - Project Zed House

Hardie® VL Plank - Project Zed House

Hardie® VL Plank - The transformative effect of interlock cladding

Hardie® VL Plank - The transformative effect of interlock cladding

Hardie® Backer - Weight Matters

Hardie® Backer - Weight Matters

Hardie® Backer - Hole in One at Shifnal

Hardie® Backer - Hole in One at Shifnal